1. After the installation of the color steel prefabricated house is completed, the user should not change the structure without authorization, let alone remove any bolt components, and do not increase or decrease partition walls.
2. Light steel components should be painted with maintenance paint once every 1-2 years to prolong the life of the product and maintain its appearance.
3. The color steel house is connected by the whole building with steel structure parts. The user arranges the electric lighting equipment. The wires cannot be directly tied to the steel structure. The wire pipe or wire groove should be installed separately to avoid electric shock.
4. All the light steel structure color steel houses connected by screws are equipped with commonly used power sockets and other facilities. The open source should not be installed or hung on the steel frame of the color steel house. Square plastic pipes or wire slots should be designed to be insulated and laid separately , to prevent leakage and electric shock.
5. After the production and installation of the color steel house is completed, non-professionals should not modify the house structure or circuit design at will, and cannot remove the screws or steel frame accessories of the house structure, let alone remove the color steel sandwich panel partition wall or add additional partitions. If there is a strong need to increase or decrease the partition wall, the professional should be notified to solve it.
6. Be sure to turn off all the power after leaving the room to prevent accidents. When using a gas stove, the color steel room should not be too close to the fire source, and high-power electrical equipment cannot be used.
7. Under normal circumstances, the frame of the color steel house should be sprayed with paint once or more within 12-24 months, which can prevent the steel frame from rusting and make the color steel house beautiful and eye-catching!